1. Surface Intervention
- Preventive maintenance Xmas tree and wellhead components to ensure well integrity
- Corrective maintenance Xmas tree and wellhead components to ensure well integrity
- Well revival : Offload the well thru testing
barge
2. Downhole Intervention
- Downhole safety valve maintenance to ensure well integrity
- Maintain field deliverability
– Gas lift installation
– ESP installation
– Capillary string installation in gas well
- Control excessive water production
– Chemical water shut-off.
- Control sand production
– Chemical sand consolidation
- Maintain full access to well TD
– Sand washing
Slickline Unit
- Well Monitoring (SGS, FGS, BPTPBU
- Memory PLT
- Tubing investigation (leak detection, gyro survey, MIT)
- Support LWO (well accessibility, bailing, run dummy tools, LWO preparation)
- Zone Change / Plugging (Setting plug, closing SSD, Retrieving plug, opening SSD)
Tidak ada komentar:
Posting Komentar